CIRQL: building assessment based on evidence

Building certification programme · Multicert

CIRQL assesses buildings using documents, calculations, measurements and site inspection. The result distinguishes confirmed parameters from gaps in evidence.

Submit a building

Methodology edition 1.0

Glazed LVM office building with a lit interior, photographed at dusk.
LVM office building, Münster. Photo: Dietmar Rabich, CC BY-SA 4.0. Source and licence. Illustrative photograph. The building shown has not been assessed under CIRQL.

Common EU core, national requirements, project scope

This is the intended programme architecture, not a finished set of national annexes.

  1. Common core

    Criteria, measures and evidence rules intended to apply in every European Union (EU) country.

  2. National requirements

    Building law and local practice differ. The applicable national scope is identified before each assessment. No national annex, including a Czech one, has been approved. A Polish document does not become a Czech one by translation, and Polish national requirements, including the separate CIRQL SAFE module, are not applied in other countries.

  3. Project scope

    Building boundary, phase and document list are agreed before work starts. The result covers nothing outside this boundary.

Four assessment areas

The name comes from the letters of the four areas. L stands for the building life cycle and is not scored separately.

Material circularity

Material composition, recycled and reused elements, ease of disassembly and construction waste.

Environmental impact

Carbon footprint from a building life cycle assessment, emissions during operation and water use.

Resilience

Rainwater management on site, energy demand, renewable energy, overheating in hot weather and climate risks.

Quality of use

Indoor air, thermal and acoustic comfort, daylight, accessibility, digital readiness and greenery.

Evidence behind the result

The document list is set for each building after qualification.

  1. Design and as-built documentation

    Drawings, technical descriptions, product schedules and changes made during construction.

  2. Calculations

    Life cycle assessment with carbon footprint, energy performance certificate, thermal simulations and daylight calculations.

  3. Records and measurements

    Commissioning of building services, indoor air quality measurements and airtightness tests.

  4. Operational data

    For occupied buildings: energy and water meter readings and building management system records.

  5. Missing evidence

    A criterion without a document is not considered met. Gaps are listed in the result.

Document readiness tool (in Polish)

Design, as-built and in use

The scope depends on the phase in which the building is submitted. The result always states that phase.

Design

Developers and designers know early which calculations and documents the assessment will need.

New or renovated building

The assessment uses design and as-built documentation. For renovations, criteria apply to the scope of works.

Building in use

Measurements and operational data come first. Design criteria are assessed from a survey or excluded with a stated reason.

Long-term operation

CIRQL-FM (facility management), a separate programme in preparation, will cover maintaining performance over time.

Result of the assessment

A certificate is issued only within the scope of methodology edition 1.0. Other assessments end with a report.

Qualification

Qualification defines the assessment scope and the type of result before work begins. Qualification alone does not award a certificate or a CIRQL level.

Certificate

For a single new office or service building in the as-built state that has been put into use and meets the prerequisites and the conditions of a level, after a positive certification decision: a certificate stating a level from CIRQL I to CIRQL IV, the assessment boundary, building phase and methodology edition.

Use by owners and lenders

Owners will see which parameters are confirmed and what to complete before sale, renovation or refinancing. Lenders will be able to check sourced building data against their own requirements; the decision stays with them.

Limits

A voluntary assessment. It does not replace permits or authority decisions, and does not confirm legal compliance, EU Taxonomy alignment or eligibility for financing.

Glazed LVM office building with a lit interior, photographed at dusk.
LVM office building, Münster. Photo: Dietmar Rabich, CC BY-SA 4.0. Source and licence. Illustrative photograph. The building shown has not been assessed under CIRQL.

Assessment process

The process separates assessment, review and decision.

  1. Qualification

    Building type, phase and available documents. Submitting a building does not commit you to an assessment.

  2. Scope

    Building boundary and the list of documents, calculations and measurements.

  3. Assessment

    An assessor who has not designed or advised on the building compares the evidence with the criteria and inspects the building on site.

  4. Review and decision

    A person not involved in the assessment decides the result.

Development status and pilots

CIRQL is a voluntary programme developed by Multicert Sp. z o.o., a Polish limited liability company.

Discuss pilot cooperation

Email biuro@multicert.pl or call +48 22 308 67 47. Give the building type, phase and country. We will tell you whether it can join a pilot assessment and which documents are needed. A pilot application does not mean a certificate will be granted.

Multicert Sp. z o.o.
Methodology edition 1.0